Precision Command855-979-7836
Precision Command

ELECTRICAL

Industry

Qualified person. Arc flash. LOTO. Every job. Every time. All documented, or not.

Electrical contractors operate under the most technically demanding documentation requirements in the trades. OSHA 1910.147, NFPA 70E and driver records create overlapping obligations that have to be documented at the employer level, not assumed from licensing. A single undocumented gap is a citation. In litigation, it is evidence of willful negligence.

OSHA 1910.147 · NFPA 70E · field service fleet records

Where you are exposed

The gaps that become lawsuits

  • 01

    Qualified-person designation must be documented by the employer under OSHA 1910.147 and NFPA 70E. An electrician's license does not satisfy the employer's documentation obligation. Missing designation records mean the employer owns every electrical incident.

  • 02

    Arc flash hazard analysis and incident energy calculations must be documented and communicated to workers before energized work begins. No written analysis means no defensible position when a worker is burned.

  • 03

    Lockout/tagout procedures must be written, equipment-specific, and documented as trained. A generic LOTO program that is not equipment-specific fails the standard.

  • 04

    Energized electrical work permits are required under NFPA 70E when work cannot be performed de-energized. Missing permit records are evidence of a systematic safety failure.

  • 05

    The vans and service bodies your electricians drive are part of the same exposure. Where FMCSA applies to your vehicles, driver qualification files are required, and in a negligent entrustment claim the same records are demanded either way.

How Precision Command closes it

The command system deployed

The P.A.C.E. Audit maps every electrical exposure category to its governing standard and identifies every documentation gap. We deploy a Command System that installs written qualified-person designation records, equipment-specific LOTO procedures, arc flash hazard analysis documentation, energized work permit systems, and complete driver qualification files, all maintained in a single administrative architecture that survives an OSHA inspection or a plaintiff deposition.

What the P.A.C.E. Audit looks at

What the audit tests here

01

Qualified-person designation records and the documented basis for each designation (1910.147 / NFPA 70E)

02

Equipment-specific lockout/tagout procedures and training documentation (1910.147)

03

Arc flash hazard analysis records and incident energy labeling (NFPA 70E)

04

Energized electrical work permit records and authorization documentation (NFPA 70E)

05

Driver qualification files for the field service fleet: application, motor vehicle record with annual review, medical qualification, road test where required

Common questions

What operators ask before they engage

Our electricians are licensed. Does that cover the qualified-person requirement?
No. A state electrical license demonstrates competency to a licensing board. OSHA's qualified-person standard requires the employer to document the designation based on training and experience specific to the hazards present at the work site. The employer's documentation obligation is separate from, and in addition to, any licensing requirement.
We have a LOTO program. What else does the audit look for?
OSHA requires LOTO procedures to be equipment-specific, not generic. The audit examines whether your procedures are written for each piece of equipment your crews service, whether workers have been trained on those specific procedures, and whether training records are retained. A generic program that is not equipment-specific fails the standard.
What does the P.A.C.E. Audit deliver for an electrical contractor?
A written Precision Action Plan identifying every documentation gap across qualified-person, LOTO, arc flash, and fleet categories, mapped to the specific standard each gap violates. The plan includes a prioritized remediation sequence and a $2,500 credit toward a full Command System deployment within 30 days.

Your next step

Find out where your exposure lives

The P.A.C.E. Audit maps your documentation gaps to the exact standards that govern your trade. Flat fee. Written deliverable. 14 to 21 days.